2021
Manildra - Starch tank
304ss Starch tank, 3.4m dia x 12m high
WCX Rozelle Interchange - Substation steel
Supply, fabrication, HDG, paint & installation (IES) of:
20T Roof Secondary support steel.
110T Substation support steel.
Manildra - Building 2 steelworkSupply
Supply, fabrication, HDG & installation (IES) of:
80T of building structural steelwork (6 floor levels), including all floor grating & handrails.
Manildra - RD9 ductwork
Supply, fabrication & delivery of the Gluten drying system:
Ring duct (304 Stainless steel) consisting of curved rectangular & transitional ducts.
Bag filter Exhaust & Stack assembly (304 Stainless steel) consisting of rolled (1500 diameter) ductwork & stack.
Bluescope steel - Waste Gas stack
Fabrication, delivery & installation (IES) of the Waste gas stack for Bluescope steel consisting of (9) flanged stack segments 6.5m diameter x 4.5m high, each segment delivered as a completed fabrication.
AKMS - BHP Kalgoorlie Dryer kiln shell
Supply, fabrication & delivery of the Dryer kiln shell, 2.1m diameter x 12.5m long complete with internal liners & lifters. Delivered to Kalgoorlie, WA
2020
CPB John Holland - M4-M5 link main tunnel Ventilation
Design, supply, fabrication, HDG & installation (IES) of approx. 200T of Fan transition ducts & support steel.